Arithmetic: Time and Work Test-5

Congratulations - you have completed Arithmetic: Time and Work Test-5.You scored %%SCORE%% out of %%TOTAL%%.You correct answer percentage: %%PERCENTAGE%% .Your performance has been rated as %%RATING%%
Your answers are highlighted below.
Question 1
If it takes A four days to dig a certain ditch, whereas B can dig it in 8 days and A, B, C together can dig it in $ \displaystyle 2\frac{2}{7}$ days, how long C alone would take to dig it?
A
8
B
4
C
6
D
16
Question 1 Explanation: 
Let the ditch take 16 units to dig up.
A does 4 units per day and B does 2 units per day.
A+B+C can do $ \displaystyle \frac{16}{\frac{16}{7}}=7\,units/day$
C does 7-4-2 = 1 unit of work per day.
Therefore, C digs the ditch in 16/1 = 16 days.
Question 2
A sum of Rs.25 was paid for a work which A can do in 32 days, B in 20 days, Band C in 12 days and D in 24 days. How much did C receive if all the four work together?
A
Rs.15/3
B
Rs.14/3
C
Rs.13/3
D
Rs.16/3
Question 2 Explanation: 
Let the total work be 480 units.Capture98
$ \displaystyle C'\,share\,=\frac{16}{15+24+16+20}=\frac{16}{75}\,\,of\,Rs.25=Rs.\,\frac{16}{3}$
Question 3
A cistern can be filled by two pipes filling separately in 12 and 16 min respectively. Both pipes are opened together for a certain time but being clogged, only 7/8 of full quantity water flows through the former and only 5/6 through the latter pipe. The obstructions, however, being suddenly removed, the cistern is filled in 3 min from that moment. How long was it before the full flow began?
A
4.5 min
B
2.5 min
C
3.5 min
D
5.5 min
Question 3 Explanation: 
Let the total quantity be 96p liters.
A fills @ 8p l/min. and B fills 6p l/min.
Rate of A+B /min= 8p + 6p = 14p l/min.
Now due to obstruction,
A’s rate is 8p X 7/8 = 7p l/min. and B’s rate is 6p x 5/6 = 5p l/min.
Total rate of A+B /min = 7+6 = 12p l/min.
Let the time for which the clog is there be t mins.
For 3 mins the pipes had a combined rate of 14p l/min.
In 3 mins pipes filled up = 14p x 3= 42p l/min.
Left (96 - 42)p l/min= 54p l/min.
Time when clogged pipes supplied the water is = 54p/12p = 4.5 mins.
Question 4
The work done by a woman in 8 h is equal to the work done by a man in 6 h and by a boy in 12 h. If working 6 h per day 9 men can complete a work in 6 days, then in how many days can 12 men, 12 women and 12 boys together finish the same working 8 h per day?
A
$ \displaystyle 2\frac{1}{2}$
B
$ \displaystyle 1\frac{1}{2}$
C
$ \displaystyle 3\frac{1}{2}$
D
None of these
Question 4 Explanation: 
Let the work be of 72 units.
1 woman does 72/8=9 units of work per hour.
1 man does 72/6=12 units of work per hour.
1 child can do 72/12=6 units of work /hour.
At 6 hours per day 9 men can do 9 x 6 x 12 units of work in 1 day.
Therefore, at  6 hours per day 9 men can do 9 x 6 x 6 x 12 units of work in 6 day.
12  men +12 women +12 children can do 12 (9+12+6) = 12 x 27 units of work in 1 hour 1 day.
Total number of hours required $ \frac{9\times 6\times 6\times 12}{12\times 27}=12\,\,hours$ The group can work for 8 hours per day.
Therefore it will take 12/8 = 1 ½ days to finish the work.
Once you are finished, click the button below. Any items you have not completed will be marked incorrect. Get Results
There are 4 questions to complete.
List
Return
Shaded items are complete.
1234End
Return

Want to explore more Arithmetic Tests?

Explore Our Arithmetic Tests

FREE CHEAT SHEET

Learn
How to Master VA-RC 

This free (and highly detailed) cheat sheet will give you strategies to help you grow

No thanks, I don't want it.

Join our Free TELEGRAM GROUP for exclusive content and updates

Rsz 1rsz Close Img

Join Our Newsletter

Get the latest updates from our side, including offers and free live updates, on email.

Rsz Undraw Envelope N8lc Smal
Rsz 1rsz Close Img